Departmental Rates & Fees
Fixed Fees for Commonly Requested Work
Work Type | Fixed Fee |
---|---|
PAIN - Repaint average office (up to 150 sf with 10 ft ceilings) | $675.00 |
ELEC - Install one to nine power/data drops1 | $575.00 each |
ELEC – Install ten or more power/data drops1 | $475.00 each |
ELEC, CARP - Install client-provided TV Bracket with (power/data1) | $ 925.00 |
CARP - Install client-provided TV Bracket (excludes power/data) | $ 350.00 |
CARP - Provide and install standard markerboard (includes miscellaneous materials, labor and contingency). | See table below for markerboard fixed fees. |
Size | Cost |
---|---|
2’-0” x 3’-0” | $ 340.00 |
2’-0” x 4’-0” | $ 360.00 |
3’-0” x 4’-0” | $ 415.00 |
4’-0” x 4’-0” | $ 480.00 |
4’-0” x 5’-0” | $ 560.00 |
4’-0” x 6’-0” | $ 685.00 |
4’-0” x 8’-0” | $ 820.00 |
4’-0” x 10’-0” | $ 1015.00 |
4’-0” x 12’-0” | $ 1290.00 |
4’-0” x 14’-0” | $ 1460.00 |
4’-0” x 16’-0” | $ 1570.00 |
1Fixed fee for lay-in ceiling applications only. Certain facilities require an estimate due to the building construction (hard ceilings) and proximity of panels. |
---|
Contracted Services Support Fee per Policy 704.1
This fee is applied as a percentage (1.25%) of the total project cost, inclusive of both contracted design and construction services. |
Labor Rates
Labor Type | Hourly Rate |
---|---|
Carpenter Shop - Skilled Tradesman | $69.01 |
Labor Shop | $48.41 |
Custodial Worker | $42.13 |
Electric Shop - Skilled Tradesman | $72.10 |
Garage - Skilled Tradesman | $49.29 |
Grounds Shop | $59.79 |
Heating Plant - Skilled Tradesman | $81.55 |
HVAC - Skilled Tradesman | $72.10 |
Paint Shop - Skilled Tradesman | $69.01 |
Plumbing Shop - Skilled Tradesman | $72.10 |
Power Distribution - Skilled Tradesman | $72.83 |
Recycling - Maintenance Worker | $38.67 |
Tool Crib Worker | $48.41 |
Key Office Rates
Staff / Faculty / Student Key Replacement Types | Cost Per Key |
---|---|
Key Replacement - Individual | $100 |
Key Replacement – Sub Master | $200 |
Key Replacement – Building Master | $300 |
Key Replacement - FAMA Utility or Restricted Area | $500 |
Key Replacement - Gate Opener / Bollard Key | $100 |
Deposit for Special Event / Temporary Use – Individual Key | $50 |
Deposit for Special Event / Temporary Use – Bollard Key or Gate Opener | $50 | Vendor / Non-University Entity Use | Vendor / Non-University Entity Rate Per Key |
Deposit for Special Event / Temporary Use – Individual Key | $150 |
Deposit for Special Event / Temporary Use – Bollard Key or Gate Opener | $150 | Contractor Key Type | Contractor Rate Per Key |
Deposit – Bollard Key or Gate Opener | $500 |
Deposit – Individual Key | $100 |
Deposit – Sub Master Key | $500 |
Deposit – Building Master Key | $1000 |
Deposit – Utility Service Key | $2000 |
Deposit – Restricted Area Key | $2500 |
Late Return & Renewal Fee Applies to Contractors engaged thru IDIQ, JOC, and Capital Programs where retention is being held on contract. | $ 125.00 per Key for each 30-day period past due. |
Returned Check Fee (Applies to all Key Holders) | $35 |
Utility Rates
Utility Type | Cost Per Unit |
---|---|
Chilled Water | $156/1000 ton hour |
Steam | $20.25/1000 lbs. |
Electricity | Cost + $0.0136905 / kWh |
Natural Gas | Cost + $12.50 / 100 CCF |
Water/Sewer | Cost + $0.12235 / 100 gal |
Boiler Monitoring | $18.00 per site, per unit |
Recycling | $19.44/cu. yd. per pickup |
Solid Waste | Cost + $0.011347 |
Stormwater Utility | No Charge |
Remote Utility Systems & Fees
Remote Utility Systems Type | Cost Per Unit |
---|---|
HVAC | $2,750/ton |
Steam Generation | $65/pound per hour |
Electrical Distribution | $250/ kVA |
CESU Markup Calculation
Purchase/Service Type | Sample Calculation | Notes |
---|---|---|
Purchase Price | $1.00 | |
Actual Markup (15%) | $ .15 | |
Frieght Recovery (1%) | $ .01 | |
Tax Value | $.0985 | purchase price + freight value x tax (9.75%) |
Charge-out Price | $1.2585 |
Cost | Parameters |
---|---|
$ .50 | per square foot, per month |
$5.00 | per square foot, per year |
Garage Hazardous Waste Fees
Service Type | Per Item/Each | Per Invoice |
---|---|---|
Light Car & Truck Service (Shop/Supply Waste Fee) | 0.04% of Total Invoice, $2.50 Minimum | |
Battery Disposal Fee | 0.04% of Total Invoice, $2.50 Minimum | |
Mount Tractor/Truck Tires (20", 22", 24") | 0.04% of Total Invoice, $2.50 Minimum | |
Big Truck/Tractor Service (Shop/Supply Waste Fee) | $25 EA | |
Mount/Balance Supplies (4 Tires up to 16") | $5 SET | $2.50 Minimum |
FM Tire Disposal Fee | $8 EA | |
Boston Mtn. Solid Waste Fee (Large Truck/Tractor Tires) | $10 EA |