Departmental Rates & Fees
Fixed Fees for Commonly Requested Work
Work Type | Fixed Fee |
---|---|
PAIN - Repaint average office (up to 150 sf with 10 ft ceilings) | $675.00 |
ELEC - Install one to nine power/data drops1 | $575.00 each |
ELEC – Install ten or more power/data drops1 | $475.00 each |
1Fixed fee for lay-in ceiling applications only. Certain facilities require an estimate due to the building construction (hard ceilings) and proximity of panels. |
---|
TV Installation Fixed Fees
Work Type | Up to 65" | Over 65" |
---|---|---|
ELEC, CARP - Install client-provided TV Bracket with (power/data1) | $ 1,088.00 | $ 1,173.00 |
CARP - Install client-provided TV Bracket (excludes power/data) | $ 375.00 | $ 460.00 |
Room Refresh Fixed Fees
(includes miscellaneous materials, furniture moving, labor, and contingency).
Work Type | Up to 200 SQF | over 200 SQF up to 400 SQF |
---|---|---|
PAIN - Paint only, equivalent color value, up to 10ft ceilings. | $ 750.00 | $ 1,100.00 |
CARP - Carpet to Carpet Replacement | $ 3000.00 | $ 6000.00 |
PAIN, CARP - Carpet to Carpet Replacement & Paint | $ 3750.00 | $ 7100.00 |
Markerboard Installation Fixed Fees
(includes miscellaneous materials and contingency)
Size | Cost with Board | Install Only |
---|---|---|
2’-0” x 3’-0” | $ 355.00 | $ 165.00 |
2’-0” x 4’-0” | $ 380.00 | $ 165.00 |
3’-0” x 4’-0” | $ 430.00 | $ 165.00 |
4’-0” x 4’-0” | $ 500.00 | $ 165.00 |
4’-0” x 5’-0” | $ 660.00 | $ 240.00 |
4’-0” x 6’-0” | $ 755.00 | $ 240.00 |
4’-0” x 8’-0” | $ 885.00 | $ 240.00 |
4’-0” x 10’-0” | $ 1035.00 | $ 430.00 |
4’-0” x 12’-0” | $ 1335.00 | $ 430.00 |
4’-0” x 14’-0” | $ 1505.00 | $ 430.00 |
4’-0” x 16’-0” | $ 1615.00 | $ 430.00 |
1Fixed fee for lay-in ceiling applications only. Certain facilities require an estimate due to the building construction (hard ceilings) and proximity of panels. |
---|
Contracted Services Support Fee per Policy 704.1
This fee is applied as a percentage (2.5%) of the total project cost, inclusive of both contracted design and construction services. |
Labor Rates
Labor Type | Hourly Rate |
---|---|
Carpenter Shop - Skilled Tradesman | $75.00 |
Labor Shop | $52.00 |
Custodial Worker | $43.39 |
Electric Shop - Skilled Tradesman | $90.00 |
Garage - Skilled Tradesman | $57.53 |
Grounds Shop | $61.58 |
Heating Plant - Skilled Tradesman | $84.00 |
HVAC - Skilled Tradesman | $90.00 |
Paint Shop - Skilled Tradesman | $75.00 |
Plumbing Shop - Skilled Tradesman | $90.00 |
Power Distribution - Skilled Tradesman | $93.65 |
Recycling - Maintenance Worker | $39.83 |
Tool Crib Worker | $49.86 |
Key Office Rates
Staff / Faculty / Student Key Replacement Types | Cost Per Key |
---|---|
Key Replacement - Individual | $100 |
Key Replacement – Sub Master | $200 |
Key Replacement – Building Master | $300 |
Key Replacement - FAMA Utility or Restricted Area | $500 |
Key Replacement - Gate Opener / Bollard Key | $100 |
Deposit for Special Event / Temporary Use – Individual Key | $50 |
Deposit for Special Event / Temporary Use – Bollard Key or Gate Opener | $50 |
Deposit for Special Event / Temporary Use – Individual Key | $150 |
Deposit for Special Event / Temporary Use – Bollard Key or Gate Opener | $150 |
Deposit – Bollard Key or Gate Opener | $500 |
Deposit – Individual Key | $100 |
Deposit – Sub Master Key | $500 |
Deposit – Building Master Key | $1000 |
Deposit – Utility Service Key | $2000 |
Deposit – Restricted Area Key | $2500 |
Late Return & Renewal Fee Applies to Contractors engaged thru IDIQ, JOC, and Capital Programs where retention is being held on contract. | $ 125.00 per Key for each 30-day period past due. |
Returned Check Fee (Applies to all Key Holders) | $35 |
Utility Rates
Utility Type | Cost Per Unit |
---|---|
Chilled Water | $156/1000 ton hour |
Steam | $20.25/1000 lbs. |
Electricity | Cost + $0.0136905 / kWh |
Natural Gas | Cost + $12.50 / 100 CCF |
Water/Sewer | Cost + $0.12235 / 100 gal |
Boiler Monitoring | $18.00 per site, per unit |
Recycling | $19.44/cu. yd. per pickup |
Solid Waste | Cost + $0.011347 |
Stormwater Utility | No Charge |
Remote Utility Systems & Fees
Remote Utility Systems Type | Cost Per Unit |
---|---|
HVAC Refrigeration | $3,440/ton |
Steam Generation | $85/pound per hour |
Electrical Distribution | $640/kVA |
Heating Hot Water | $95,000/LS (flat fee) |
CESU Markup Calculation
Purchase/Service Type | Sample Calculation | Notes |
---|---|---|
Purchase Price | $1.00 | |
Actual Markup (15%) | $ .15 | |
Frieght Recovery (1%) | $ .01 | |
Tax Value | $.0985 | purchase price + freight value x tax (9.75%) |
Charge-out Price | $1.2585 |
Storage Space
Cost | Parameters |
---|---|
$ .50 | per square foot, per month |
$5.00 | per square foot, per year |
Garage Hazardous Waste Fees
Service Type | Per Item/Each | Per Invoice |
---|---|---|
Light Car & Truck Service (Shop/Supply Waste Fee) | 0.04% of Total Invoice, $2.50 Minimum | |
Battery Disposal Fee | 0.04% of Total Invoice, $2.50 Minimum | |
Mount Tractor/Truck Tires (20", 22", 24") | 0.04% of Total Invoice, $2.50 Minimum | |
Big Truck/Tractor Service (Shop/Supply Waste Fee) | $25 EA | |
Mount/Balance Supplies (4 Tires up to 16") | $5 SET | $2.50 Minimum |
FM Tire Disposal Fee | $8 EA | |
Boston Mtn. Solid Waste Fee (Large Truck/Tractor Tires) | $10 EA |
Updated May 16, 2024