Architects & Engineers Guide

Architect's Payment Application Form : UA6-N-1 Invoice Form (Revised 2023)
These guidelines shall inform the Construction Documents. The Construction Documents shall address all applicable provisions included herein, by way of specification, general notes, detail, and instructions to the Contractor. 
The guidelines are organized using the Master Specification Divisions, they are not however intended to replace the specification documents produced by the Architect/Engineer of Record. The language provided in the defined specification sections should be seen as supplemental to the language normally supplied by the Architect. In some cases, a full 3-PART “Guide Specification” may be provided, in those cases, the Design Professional shall modify and/or expand the language as appropriate to the project.
  PART I
Introduction and a Brief History of Planning at the  University
 
  PART II  
Planning Guidelines
 

 

IIA Site Planning

IIB Facility Planning

 
  PART III  
Procurement and Contracting (Division 00)
 

UA Front End Docs - Bid Projects (Zip Folder)

UA Front End Docs - CMGC Cost Plus with GMP (Zip Folder)

 

  PART IV(A)
General Requirements (Division 01)
 
 

See Front End Docs zip folders above

OM Data Integration Spreadsheet

criteria for Commissioning (2013)

criteria for Project Close-out Submittals (revised 2023)

criteria for Stormwater Compliance

 
  PART IV(B)     
Facility Construction (Divisions 02 - 19)
 
 

Division 02 - Existing Conditions

Division 03 - Concrete

Division 04 - Masonry

Division 05 - Metals

Division 06 - Wood, Plastics & Composites

Division 07 - Thermal & Moisture Protection

Division 08 - Openings

Division 09 - Finishes

Division 10 - Specialties

Division 11 - Equipment

Division 12 - Furnishings

Division 13 - Special Construction

 
  PART IV(C)
Facility Services (Divisions 20 - 29)
 
 

Division 21 - Fire Suppression

Division 22 - Plumbing

Division 23 - Heating, Ventilating & Air Conditioning (HVAC)

Division 26 - Electrical

Division 27 - Communications

Division 28 - Electronic Safety & Security

UA Emission Producing Equipment Form

IDIQ Automatic Temperature Controls Diagrams (2019)

 
  PART IV(D)
Site & Infrastructure (Divsions 30 - 33)                                                                                       
 
 

Division 31 - Earthwork

Division 32 - Exterior Improvements (revised 2022)

32 16 24 SENIOR WALK (.doc)

Division 33 - Utilities