Architects & Engineers Guide

Architect's Payment Application Form : UA6-N-1 Invoice Form (Revised 2023)

These guidelines shall inform the Construction Documents. The Construction Documents shall address all applicable provisions included herein through specifications, general notes, details, and instructions to the Contractor.

The guidelines are organized using the Master Specification Divisions; however, they are not intended to replace the specification documents produced by the Architect/Engineer of Record. The language provided within the specified sections is supplemental to the language normally supplied by the Architect. In some cases, a full three-part Guide Specification may be provided. In those cases, the Design Professional may modify and/or expand the language as appropriate for the project, provided that the UA Standards are preserved.

PART I          
Introduction and a Brief History of Planning at the  University
PART II  
Planning Guidelines
 

IIA Site Planning

IIB Facility Planning

IIC Other Standards

PART III  
Procurement and Contracting (Division 00)
 
PART IV(A)            
General Requirements (Division 01)
 
PART IV(B)  
Facility Construction (Divisions 02 - 19)
PART IV(C)
Facility Services (Divisions 20 - 29)
 
 

MEMORANDUM : Communication Methods for Life Safety Systems 

PART IV(D)
Site & Infrastructure (Divsions 30 - 33)                                                                               
 
PART V

Change Log 2026 10 01